PROFESSIONAL EXPERIENCE
Construction
Manager-AT&T Wireless
2014-current
·
Responsible for New Site Builds start to finish, UMTS,
LTE upgrades, pre-con,
bid and punch walks, design walks, Verification of RF/CD,
Ordered all equipment and
approved all Work Authorization.
·
Coordinated with construction vendors to ensure site
construction is completed per Scope of Work, integrated
and brought on air on time and within
budget.
·
Verified all required documentation and deliverables were
uploaded for close out.
·
Addressed any vendor or RF engineering issues that arose
to maintain
construction schedules.
Field
coordinator –ALU / Sprint
Wireless
2013-2013
Provided field coordinator services and managed
the project’s construction progression, deliverables and related activities
required according to Alcatel-Lucent’s specific Sprint Network Vision project
plan.
Responsible for managing all activities related
to site construction of cellular base station sites. Such activities include,
by way of example, and not limitation, coordinating on-site bid walk reviews
with General Contractors. Managed both Construction Field Supervisors as well
as General Contractors and A&E firms
Cell Site Technician - MYCOM North America
AT&T, VERIZON & NSN Nokia Siemens Networks (T-Mobile)
2012 – 2013
•Certified
Nokia-Siemens Networks
·
Commissioning
and Integration
·
UMTS &
GSM upgrades (E NODB)
·
Cell Site
Upgrades (MLPPP,7705 and Tellabs SIAD)
·
Site
Surveys
Construction Coordinator - Palo Verde Nuclear Generating Station
(Sheely Construction) Arizona
2011-2012
·
Field
Coordinator for the PA West Expansion Project.
·
Installation
of new underground fire protection system (Fiberglass reinforced pipe).
·
Demolition
and removal of existing abandoned utilities
·
Installation
of new containment structure i.e. two 10,000 gallon fuel tanks
·
Large Bore
PCCP Post tension repairs – WRSS Water Supply Pipeline
Cell Site Telco Field Technician–KINETICOM INC. Arizona 2009-2011
·
Installation
and maintenance of T1 lines
·
Test and
troubleshoot microwave circuits
Instrument Man – RS Team Land Surveyor
(Contracted to Palo Verde)
Arizona
2008 - 2009
·
Responsible
to keep precise field notes and maintain all equipment
·
Conventional
and GPS surveying, Field as-build and staking jobs using Top Con and other
conventional survey equipment
·
Perform all
duties pertaining to the rod man position
Construction
Manager/ Project Manager – Canterra Homes
Arizona
2005 - 2008
·
Coordination
and scheduling for all subcontractor from underground stage to final build
·
Company
liaison to city inspectors through all building phases
·
Performed
all city inspection and homeowner walks from pre constructions, S&S,
frame, pre-carpet and trim out, including homeowner sign offs
·
Managed
master plan changes, blue print red lines, billings and PO’s for up to three
communities concurrently.
Construction Manager – Fulton Homes
Arizona
2003 – 2005
·
Managed
schedule for all new home construction for assigned community
·
Supervised
subcontractors for all phases of construction
·
Responsible
for final walks with city inspectors and customers
EDUCATION / TRAINING
AA Business
Management (Glendale Community College)
OSHA 30
(Safety Class)